Building information modeling definition

Hem / Teknik & Digitalt / Building information modeling definition

Integrating BIM with Connected FM solutions (like Facilio) allows organizations to manage assets, monitor performance, and continuously optimize buildings — turning BIM data into real-world building intelligence.

.

BIM is only the beginning of what's possible with modern construction tools and technology.

However, the way in which stakeholders exchange information differentiates it from other levels. These complex, high-stakes projects demand coordination across dozens of disciplines, stakeholders, and regulatory frameworks. Better cost control: Manage budgets in real time

By integrating cost data (5D BIM), project teams gain full visibility into budget impacts at every stage.

  • Tracks material and labor costs automatically as design changes occur.
  • Prevents budget overruns through early cost forecasting.
  • Improves stakeholder confidence with transparent, data-backed cost reporting.

Pro Tip: Use BIM’s what-if cost simulations to evaluate different design options, balancing quality, performance, and budget before finalizing a plan.

4.

This catches accessibility, fire safety, and structural issues early, slashing approval times.

Tender Preparation: The 3D model generates consistent 2D drawings (plans, sections, elevations) for contractor bidding, eliminating coordination errors in tender documents.

General contractors use BIM to catch problems before construction, optimize schedules, and control costs:

Clash Detection: Consolidating all subcontractor models (MEP, facades, steel) into a Common Data Environment reveals conflicts in the office, not on site.

Each asset comes with its specifications, performance data, and maintenance records, all accessible directly from the model. Design changes instantly update costs—enabling proactive management instead of reactive overruns.

Documentation: Coordinated models generate Combined Services Drawings, concrete plans, and setting-out drawings that match the digital coordination.

FM Handover: The as-built model becomes a digital twin operational asset with equipment data in COBie format, delivering value long after construction.

Subcontractors receive the main contractor's construction model and develop their trade-specific scope:

Clash Avoidance: MEP subcontractors model their systems (HVAC ducts, electrical conduits, plumbing pipes, fire protection) and coordinate to ensure no clashes within their scope or with other trades.

CDE Submission: Upload models to the project's Common Data Environment—typically Autodesk Construction Cloud, ProjectWise, or OpenBIM platforms like BIMCollab—for coordination review.

Shop Drawings: Generate fabrication and installation drawings from their coordinated BIM model, showing exact routing, connections, and equipment layouts.

One of BIM's most immediate benefits is the ability to identify clashes before construction begins.

Facility teams can analyze asset performance, predict failures before they occur, and schedule service at the best possible time, keeping downtime and disruptions to a minimum.

3. Next came CAD (Computer Aided Design), which helped drafters see the benefit of plans in a digital environment. It's essential for complex infrastructure like data centers, hospitals, and civil projects.

Level of Development (LOD) defines model detail at each stage.

W

When BIM is connected to real-time building performance systems, it becomes the backbone for advanced capabilities like fault detection and diagnostics that help teams catch anomalies early and respond proactively.

What are the benefits of BIM?

Building Information Modeling (BIM) delivers measurable advantages across every stage of the building lifecycle, from early design to ongoing facility operations. 

By unifying data, workflows, and visualization, BIM drives efficiency, accuracy, and collaboration like never before.

Here’s how it translates into real-world impact:

1.

Many firms are at Level 1 BIM, which doesn’t involve much collaboration, and each stakeholder publishes and manages their own data.

Level 2 BIM: teams work in their own 3D models

Level 2 BIM begins to add in a collaborative environment. Not entirely. What are the benefits of integrating BIM with CAFM or CMMS?

  • Centralized access to all building and asset data.
  • Automated maintenance scheduling and task tracking.
  • Accurate asset information for better planning and budgeting.
  • Visual access to asset location and condition through 3D models.
  • Improved collaboration between design, operations, and maintenance teams.

5.

As BIM becomes increasingly more sophisticated, 4D, 5D, and even 6D BIM will start to play a part in the process.

More and more, stakeholders are walking through BIM models using augmented and virtual reality. By working collaboratively in a BIM environment, all of this becomes much less likely, setting the stage for a better tomorrow.

As we look to the future, we see tremendous potential.

building information modeling definition

What challenges come with BIM and FM integration?

Common challenges include keeping BIM models updated post-construction, ensuring data consistency, and achieving smooth interoperability between platforms. Each component carries data about its size, material, and performance, creating an intelligent model that supports design, analysis, and maintenance decisions.

2.

Use space and resources more efficiently
BIM’s built-in spatial intelligence helps facility teams understand how spaces are actually used. BIM service providers bridge this gap by converting 2D to BIM.

In Singapore, BIM data captured in IFC+SG enables regulatory agencies to automatically check building code compliance—accessibility, fire safety, structural requirements—through CORENET X submissions.

Contractors need LOD 350-400 with exact routing, supports, and connections to build. Below are brief descriptions of the first three levels and an explanation of what criteria is involved at each stage.

Level 0 BIM: paper-based drawings + zero collaboration

Level 0 BIM refers to not operating collaboratively at all. How does BIM support facilities management?

BIM provides a complete digital model of a building’s assets, systems, and spaces.

Unlike simple 3D modeling tools like SketchUp or Rhino, BIM contains embedded information essential for the entire project lifecycle—from design through construction to facility management. Integrating Building Information Modeling (BIM) with a Connected CAFM platform like Facilio turns design intelligence into ongoing operational value.

While BIM captures how a building is designed and constructed, Facilio extends that intelligence into real-time operations, bridging the gap between project completion and continuous performance.

Here’s how the two work together:

  • Real-time asset visibility: Facilio connects BIM data with live asset performance, helping teams visualize and act on equipment conditions instantly.
  • Automated maintenance: Model insights trigger work orders and predictive maintenance, ensuring issues are addressed before failures occur.
  • Sustainability optimization: Facilio uses BIM’s building data to enhance energy efficiency and track sustainability KPIs.
  • Smooth handover: Design, asset, and maintenance data flow seamlessly from construction teams to operations.

Together, BIM and Facilio move facility management from static models to living, adaptive ecosystems, where data continuously informs smarter, more sustainable decisions.

Who benefits most from BIM and Connected CAFM integration?

Building Information Modeling (BIM) delivers real value when extended into operations through a Connected FM platform like Facilio.

This allows teams to analyze consumption, identify inefficiencies, and make targeted improvements for energy savings and carbon reduction.

7.